Generate the Report

  • Click the Report icon.

Include Inspections in Report

The Application lets you rename inspections and/ or exclude them from the report. This option is available under the Inspections panel.

To rename the inspection:

  • Right-click on the inspection name in the Inspections panel.
  • Click Rename
  • Enter the desired name and click OK.
  • The new name displays in the Inspections panel.

To exclude the inspection from the report: 

  • Right-click on the inspection name in the Inspections panel.
  • Click Exclude from report.
  • The inspection name gets crossed out in the Inspections panel.
  • The inspection is not included in the next generated report.
  • Click the Report  icon.
Did this answer your question?